Every low-voltage system, one standard.
Cabling, networks, cameras, doors, voice and AV — designed, installed, certified and supported by one Southern California team for 28 years. One crew, one point of contact, from the first conduit to the final report.
Fig. A-00 · Data hall - Est. 1998
- Glendale HQ
- 6 disciplines
- Serving all of Southern California
- A-01 Physical layer
Structured Cabling & Fiber
Cat 6A, Cat 8 and fiber installations built to ANSI/TIA standards — every run tested, labeled and certified.
Includes:
- Cat 6A / Cat 8 copper
- Fiber backbone
- Testing, labeling & certification
- Business & corporate relocation
- A-02 Network layer
Networking & Wireless
Switches, firewalls, VLANs, UPS and enterprise Wi-Fi for stable, secure uptime.
Includes:
- Switching, firewall & VLANs
- UPS & power
- Enterprise Wi-Fi design
- Internet service brokerage
- POS install & training
- A-03 Security layer
Video Surveillance
High-resolution cameras, NVRs and remote monitoring systems.
Includes:
- IP cameras & NVRs
- Remote monitoring
- LED perimeter & yard lighting
- A-04 Entry layer
Access Control
Secure doors, strikes, maglocks and video intercom systems.
Includes:
- Card & mobile access
- Strikes & maglocks
- Video intercom
- Time & attendance
- A-05 Voice layer
Voice & Unified Comms
Cloud voice, phone systems, call flows and team onboarding.
Includes:
- Cloud phone systems
- Call flows & onboarding
- Storage, backup & messaging
- PA & zone paging
- A-06 Experience layer
Audio & Video
Displays, speakers, mounts and tuning for any space or scale.
Includes:
- Conference rooms
- Displays & signage
- Distributed audio
- C-01 Licensed · Bonded · Insured
- C-02 BICSI-certified technicians
- C-03 24/7 emergency response
Five steps, every job.
The same process from a single-rack retrofit to a multi-site rollout. Nothing is signed off until it has been tested and documented.
-
Step 01: Assess
We walk the site with you — pathways, closets, power, existing systems — and document what is actually there before anything is priced.
-
Step 02: Design
A clear plan for the infrastructure, scoped to your site — no guesswork, no surprises.
-
Step 03: Install
ANSI/TIA-compliant installs with pre-staged kits, after-hours work and phased cutovers — we work around your operations, not through them.
-
Step 04: Certify
Every run, rack and port is tested and documented before we leave the site. You get the reports.
-
Step 05: Support
Post-install MAC work, warranty response and managed service contracts. We don’t disappear after sign-off.
Not sure where to start?
Most projects touch more than one system. Tell us about the site — we’ll walk it with you, document what’s there and scope the job before anything is priced.