Built for the future.

28 years designing, installing and certifying the cabling, networks and security systems Southern California businesses run on.

  • Licensed · Bonded · Insured
  • BICSI-certified technicians
  • 24/7 support for contracted clients
A technician in a hi-vis vest working at a network rack with tools laid out on the floor
Cable test · Live demo Sample

Cable IDF2-A-024 · Cat 6A permanent link

WALL JACK PATCH PANEL Pin 1: White/orange Pin 2: Orange Pin 3: White/green Pin 4: Blue Pin 5: White/blue Pin 6: Green Pin 7: White/brown Pin 8: Brown 1 1 ✓ 2 2 ✓ 3 3 ✓ 4 4 ✓ 5 5 ✓ 6 6 ✓ 7 7 ✓ 8 8 ✓

All 8 wires connected correctly.

B-01 Platforms we install

Brands we install and support.

  • Cisco
  • Cisco Meraki
  • Fortinet
  • Aruba
  • Ubiquiti
  • Netgear
  • Axis Communications
  • Bosch
  • Hikvision
  • LTS
  • Honeywell
  • CommScope
  • Panduit
  • Crestron
C-01 System explorer

How the six systems fit in a building.

Most of a building’s systems are hidden in the walls and ceilings. We design, install and test all six so they work together from the start.

Select a system

SECTION A–A · TYPICAL COMMERCIAL BUILDING ALL SYSTEMS L3 L2 L1 OFFICES CONFERENCE IDF-2 OPEN OFFICE MDF LOBBY BREAK ROOM ISP · FIBER
A-01 · Physical layer

Structured Cabling & Fiber

Cat 6A, Cat 8 and fiber installed to ANSI/TIA standards. Every run is tested, labeled and certified.

  • Cat 6A / Cat 8 copper
  • Fiber backbone
  • Testing, labeling & certification
  • Business & corporate relocation
Next See how every job runs
D-01 The Armak standard

How every job runs.

The same five steps on every job, from a single-rack retrofit to a multi-site rollout. Nothing is signed off until it has been tested and documented.

The five steps

Step 01 · Assess

Assess

We walk the site with you and write down what’s there: pathways, closets, power and existing systems. Nothing is priced until that’s done.

Live demo · Site walk Sample
OPEN CEILING CLOSET OFFICE CONFERENCE OPEN OFFICE LOBBY ELEC 1 2 3 4 5

Findings

  1. 1 Existing systems 2 analog cameras, 1 keypad door
  2. 2 Existing cabling Cat 5e, unlabeled
  3. 3 Pathways Open ceiling to the closet; one wall needs conduit
  4. 4 Power 1 dedicated circuit near the rack
  5. 5 Telecom closet 1 wall-mount rack, little free space

✓ Site report ready · priced from this

Each stop on the walk is pinned on the floor plan and logged as a finding. The findings go into a written site report, and the price comes from that report.

Step 02 · Design

Design

We draw up where every cable, jack and device will go, and price the job from that drawing.

Live demo · Site plan Sample
CLOSET OFFICE CONFERENCE OPEN OFFICE LOBBY

Bill of materials · this floor

  • Rack in the closet 1

Tap a layer to highlight it.

✓ Plan ready · priced from the drawing

The walk becomes a drawing: every jack, access point and camera placed, Wi-Fi coverage overlapping so there are no dead zones, and every cable routed home to the closet. The quote comes from this plan.

Step 03 · Install

Install

Installed to ANSI/TIA standards with materials prepared ahead of time. Disruptive work can be scheduled after hours, and systems are switched over in planned phases so your business keeps running.

Live demo · The closet, before and after Sample
UPS BEFORE no labels · no slack management A-01 A-12 A-13 … A-24spare SW-1ports 1–12 AFTER dressed · labeled · tested
  1. Pre-staged Panels, labels and parts prepared before arriving on site.
  2. After-hours install The noisy work happens while the office is closed.
  3. Phased cutover Systems switched over in planned phases, so the business keeps running.
Same closet, installed two ways. Drag the slider. When cables are dressed and every port is labeled, anyone can trace a connection in seconds and future changes are quick.

Step 04 · Certify

Certify

Every run, rack and port is tested and documented before we leave the site. You get the reports.

Cable test · Live demo Sample

Cable IDF2-A-024 · Cat 6A permanent link

Which cable to test
WALL JACK PATCH PANEL Pin 1: White/orange Pin 2: Orange Pin 3: White/green Pin 4: Blue Pin 5: White/blue Pin 6: Green Pin 7: White/brown Pin 8: Brown 1 1 ✓ 2 2 ✓ 3 3 ✓ 4 4 ✓ 5 5 ✓ 6 6 ✓ 7 7 ✓ 8 8 ✓

Margin = how far the cable beats the standard’s limit. Above zero passes.

  1. Every wire lands on the right pin Wire map 8 / 8 correct
    What’s this?

    A network cable has 8 small wires. Each one must connect to the matching pin at both ends, in the standard color order. One wire in the wrong spot and the connection drops out or never works at all.

    More in the glossary
  2. How long the cable is Length 47.2 m
    limit 90 m
    What’s this?

    The tester times a signal down the cable and back to measure its length. A Cat 6A permanent link can be up to 90 meters; longer runs lose too much signal.

    More in the glossary
  3. Signal leaking between wire pairs Crosstalk (NEXT) +5.8 dB margin
    limit
    What’s this?

    The wires travel in four twisted pairs, side by side. Crosstalk is signal from one pair bleeding into another, like hearing a neighbor’s call on your line. Careful twisting and termination keep it low.

    More in the glossary
  4. Signal fading over the distance Insertion loss +12.3 dB margin
    limit
    What’s this?

    Every cable weakens a signal a little along its length. This checks that enough signal survives to the far end to run at full speed.

    More in the glossary
  5. Signal bouncing back from connections Return loss +4.1 dB margin
    limit
    What’s this?

    A poorly made connection reflects part of the signal back toward the sender, like an echo. The less echo, the cleaner the connection.

    More in the glossary

This cable meets the Cat 6A standard. Every cable on the job is tested and documented like this before sign-off.

What happens next: the jack is re-terminated and the cable is tested again. Nothing is signed off until it passes.

New to this? Cat 6A · Cable certification

Step 05 · Support

Support

Post-install MAC work, warranty response and managed service contracts. We stay available after the job is done.

Live demo · A move request Sample
  1. Request
  2. Look up
  3. Re-patch
  4. Test & update
Ticket MAC-0417 Done

Move desk 2B-14 to 3A-02

As-built record
Desk jackPanel port
2B-13 A-13
2B-14 A-14
3A-01 A-21
3A-02 A-22 · in use
PATCH PANEL A SWITCH A-14 A-22
  • Link tested at the new desk
  • Record updated: 3A-02 → A-22
Moves, adds and changes go fast when the install was labeled and documented: look up the record, move one patch cord, test it, update the record. No tracing wires through the ceiling.

Every job starts at step 01.

Request a site assessment
D-03 Principles
  • 01

    Built to standard

    ANSI/TIA-compliant installs. Every cable tested, every port labeled, every job documented to spec.

  • 02

    From closet to campus

    From a single rack to a multi-site rollout, you work with the same team and one point of contact.

  • 03

    Cutover-ready

    Materials are prepared ahead of time, noisy work can be scheduled after hours, and cutovers are phased so your business keeps running.

  • 04

    After the install

    Moves, adds and changes, warranty response and managed service contracts.

F-01 By the numbers

Armak in numbers. Since 1998, across Southern California.

28

Years in business

Since 1998.

946+

Projects delivered

24/7

Support

For contracted clients.

24

Cities served

Across 7 counties.

Next Buildings we plan for
H-01 Service area

All of Southern California, from Santa Barbara to Chula Vista.

From our Glendale headquarters we serve 24 cities in 7 counties, from the Central Coast to San Diego County.

120°W119°W118°W117°W 33°N34°N35°N Santa Barbara Lancaster San Bernardino Long Beach Temecula San Diego HQ · Glendale
Glendale HQ · 34.1425° N, 118.2551° W 24 cities · 7 counties

Headquarters

Glendale, CA

34.1425° N, 118.2551° W

Cities we serve, by county

  • Santa Barbara County 01

    • Santa Barbara
  • Los Angeles County 10

    • Lancaster
    • Palmdale
    • Santa Clarita
    • Burbank
    • Pasadena
    • Glendale HQ
    • Beverly Hills
    • Los Angeles
    • Malibu
    • Long Beach
  • Ventura County 02

    • Ventura
    • Oxnard
  • San Bernardino County 01

    • San Bernardino
  • Riverside County 02

    • Riverside
    • Temecula
  • Orange County 04

    • Anaheim
    • Santa Ana
    • Irvine
    • Huntington Beach
  • San Diego County 04

    • Oceanside
    • Escondido
    • San Diego
    • Chula Vista
Ready? Tell us about your site
J-01 Start a project

Tell us about the site.

Pick the systems and leave your details. We’ll walk the site, scope the work and send you a clear written plan and price.

What are you building?

Select all that apply (required)

Where can we reach you?

Required

By sending this, you agree to our terms. We only use your details to reply to you. Privacy policy