N-00 Plan a project

Start with the practical bits.

Three tools for the planning stage: what to have ready before anyone visits, a rough idea of quantities, and a quick check on whether your cabling is due for an upgrade.

N-01 Before we visit

The site-walk checklist.

Have these ready and the first visit does the work of two.

  1. 01 Floor plans, or a sketch Even a phone photo of the fire-evacuation map on the wall works.
  2. 02 Where the internet comes in Your provider, and where the modem or router lives.
  3. 03 Access to the closet and the ceiling The network closet or server room, plus who can let us in and where a ladder can go.
  4. 04 What’s there now Switches, phones, cameras, door readers, Wi-Fi access points. Photos are fine.
  5. 05 Headcount, now and in 2–3 years Desks today, planned hires, any moves or expansions.
  6. 06 Known problems Dead Wi-Fi spots, slow areas, doors that don’t lock, cameras that don’t record.
  7. 07 Building rules After-hours access, landlord requirements, hours when noisy work isn’t OK.
  8. 08 Who decides, and who runs IT day to day So the plan goes to the right people the first time.

Printed from armak.tech/plan · (818) 858-4615

N-02 Rough quantities

Estimate quantities for your office.

Planning numbers from typical office layouts. Walls, ceiling height and how you use the space change them; the real count comes from the site walk.

Data drops what’s a drop?
—
2 per desk, plus shared devices (printers, TVs) and ceiling devices.
Wi-Fi access points what’s that?
—
About one per 2,000 sq ft of open office, at least one per floor. Walls and dense seating need more.
Cameras what’s covered?
—
A starting point: every exterior door, the lobby, and the main corridor on each floor.
Door readers what’s that?
—
One per controlled door. Interior doors (server room, storage) add to this.

Want these numbers checked against your actual floor? Send us your plan and we’ll scope it.

N-03 Three questions

Check the age of your cabling.

What’s printed on your network cables? (Look at the jacket near a wall jack.)
How old is the cabling?
Any of these happening?
N-04 What you get at handover

A sample certification report.

Every cable we install is tested like this. This is the kind of report that comes with the job, one per cable.

Cable test · Live demo Sample

Cable IDF2-A-024 · Cat 6A permanent link

Which cable to test
WALL JACK PATCH PANEL Pin 1: White/orange Pin 2: Orange Pin 3: White/green Pin 4: Blue Pin 5: White/blue Pin 6: Green Pin 7: White/brown Pin 8: Brown 1 1 ✓ 2 2 ✓ 3 3 ✓ 4 4 ✓ 5 5 ✓ 6 6 ✓ 7 7 ✓ 8 8 ✓

Margin = how far the cable beats the standard’s limit. Above zero passes.

  1. Every wire lands on the right pin Wire map 8 / 8 correct
    What’s this?

    A network cable has 8 small wires. Each one must connect to the matching pin at both ends, in the standard color order. One wire in the wrong spot and the connection drops out or never works at all.

    More in the glossary
  2. How long the cable is Length 47.2 m
    limit 90 m
    What’s this?

    The tester times a signal down the cable and back to measure its length. A Cat 6A permanent link can be up to 90 meters; longer runs lose too much signal.

    More in the glossary
  3. Signal leaking between wire pairs Crosstalk (NEXT) +5.8 dB margin
    limit
    What’s this?

    The wires travel in four twisted pairs, side by side. Crosstalk is signal from one pair bleeding into another, like hearing a neighbor’s call on your line. Careful twisting and termination keep it low.

    More in the glossary
  4. Signal fading over the distance Insertion loss +12.3 dB margin
    limit
    What’s this?

    Every cable weakens a signal a little along its length. This checks that enough signal survives to the far end to run at full speed.

    More in the glossary
  5. Signal bouncing back from connections Return loss +4.1 dB margin
    limit
    What’s this?

    A poorly made connection reflects part of the signal back toward the sender, like an echo. The less echo, the cleaner the connection.

    More in the glossary

This cable meets the Cat 6A standard. Every cable on the job is tested and documented like this before sign-off.

What happens next: the jack is re-terminated and the cable is tested again. Nothing is signed off until it passes.

New to this? Cat 6A · Cable certification

N-05 Next step

When you’re ready, we’ll walk the site.